Skip to main content
R3A Architecture
  • Menu
Close
  • Home
  • People
  • Portfolio
  • Studio
    • Approach
    • Philosophy
    • Recognition
    • Markets
  • News
  • Careers
  • Business Development Inquiries
News

Rosedale Tech Ribbon-Cutting

Posted on May 6, 2024

From right to left: Cardello Electric President Matt Cardello, Rosedale Tech President Dennis Wilke, and Former Dean Tech President and Rosedale Tech Board Chairman Jim Dean standing outside of the trade show, which took place in conjunction with Rosedale Tech’s grand opening celebration of the new labs and classrooms to be used by the College’s construction-related programs.

By Jordyn Hronec – Associate Editor, Pittsburgh Business Times
May 3, 2024

On May 1, Rosedale Technical College celebrated the opening of two new labs and three classrooms on its campus designed by R3A, coinciding with National Skilled Trades Day. The additions were made possible via a partnership with local company Johnson Controls, which made an $80,000 monetary and equipment contribution. The event included a ribbon-cutting for the new facilities as well as tours and a trade show.

Share on:
  • Facebook
  • Twitter
  • LinkedIn

Categories

  • Sustainability
  • STEM
  • New Construction
  • Higher Education
  • Current Events
    • Civic/Community
  • Uncategorized

Archives

Tags

  • R3A
  • STEM
  • community
  • reskilling
  • industry
  • 4.0
  • penn
  • state
  • higher
  • mister rogers
  • interiors
  • hybrid workspace
  • SouthSide Works
  • Penn State New Kensington
  • workforce training
  • foundry
  • digital
  • education
  • university
  • controversial
  • new
  • kensington
  • pennsylvania
  • rust
  • belt
  • architecture
  • build
  • construction
  • grand
  • opening
  • manufacturing

R3A Architecture48 South 14th Street
Pittsburgh, PA 15203
USA

T +412 431 2480

Follow Us on Social Media

  • Instagram
  • LinkedIn

© 2025 R3A Architecture. All rights reserved.

  • Info Exchange Site

Website by Imagebox