The new pre-engineered shop, truck parking + storage facility, which is located on a heavily traveled corridor into the city of Pittsburgh, incorporates the idea of “Building as Billboard” by utilizing an illuminated mesh screen sun-shade to display programmable L.E.D. dynamic lighting. The program included: administrative, training, maintenance, workshop and storage spaces. Special attention was paid to issues of fire separation, operational floors and efficient energy performance.
2007
Pittsburgh, PA
46,300 sf.
LEED Certified
2008 Master Builders Association Award Finalist