Completed

2022

Location

Slippery Rock, PA

Size

Miller: 34,679 gsf.; East West Gym: 43,658 gsf.

Program

Performing Arts Program – Scene Shop, Auditorium, Dance Studio, Dance Rehearsal Spaces, Costume Shop, Black Box Theater, Classrooms, Green Rooms, Dressing Rooms

Awards

2012 AIA Ohio Honor Award for Unbuilt Projects

Miller Auditorium Renovation

  • Front Addition that has new dance rehearsal spaces, a new lobby and front of house offices and rooms and new mechanical equipment and lighting.
  • Rear addition included a complete accessible path from the front of the building to the rear, new loading dock, new scene shop and storage as well as new dressing rooms for stars and general cast as well as green rooms and new mechanical systems and lighting.
  • Renovations of the auditorium with finishes, seating, accessibility upgrades and new orchestra pit lift.
  • Upgrades to AV equipment and theatrical systems as well as the renovation of Miller Auditorium’s catwalk and the stage.

East West Gym (Pearl K. Stoner Instructional Complex) Renovation

  • Renovation of the West Gym Dance performance studio and renovation of new dance rehearsal spaces and new dressing rooms and green rooms and new mechanical systems and lighting.
  • Renovation of the East Gym into a new Black Box theater and inclusion of new back of the house spaces including classrooms and costume shop with new finishes, new mechanical systems and lighting.
  • Rear addition was added to East Gym to provide a new elevator to create and accessible route to the building and to the new control room and catwalk access. This also includes upgrades to AV equipment and theatrical systems as well as a new catwalk for Black Box Theater.
  • Renovations of the existing building with new finishes, seating, and accessibility upgrades.
Back to Top